Project Details

Location

Edmonton, AB

View on Google Map

Architect

Summary

This project involves the renovation and addition to an existing building on the Goldbar site. Our team provided the structural, mechanical, electrical, and civil engineering services for this significant renovation project. The project includes the addition of a control room, converting existing offices and support spaces into change rooms, new office spaces, and classroom areas. Additionally, sprinklers will be added to the entire building.

Our mechanical team designed the new HVAC, sprinkler, plumbing systems, service upgrade, and BMS for the building. To ensure the new systems will support the building operations our team conducted a thorough analysis of the existing system for capacity to ensure it’s ability to handle the increased loads. The new mechanical systems are designed to tie into the existing infrastructure including the existing sanitary and storm sewer, HVAC systems, and the addition of new water service to the building. KD Mechanical’s scope also included:

  • A new controls system for the building to connect to the existing site wide controls system.
  • A new HVAC unit to serve the control room which operates 24/7.
  • New water heaters.

KM Civil’s scope included the following:

  • Review of existing utilities alignments onsite and offsite.
  • Review of stormwater Management requirements and overland drainage for the development.
  • Integrate and accommodate new building into the existing infrastructure.
  • Provide new water service connection to the building.
  • Provide design for new raised pararamp into the building.
  • Construction Administration and Field Reviews.

For any further inquiries, please feel free to contact us.