Stave Lake Multi-Family Design Project
This project consists of a stacked townhouse development as well as single family homes and a potential retail site on a 19.3 acre parcel in Mission, BC.
This project consists of a stacked townhouse development as well as single family homes and a potential retail site on a 19.3 acre parcel in Mission, BC.
The Burnett Street Condo project is a 50 unit, five-storey wood frame apartment building on one level of concrete underground parking. The fifth floor rooftop includes an outdoor amenity area.
This project consists of a 24 Unit, four-storey mixed-use commercial/residential building. The main floor will consist of commercial area with residential area on the floors above.
Crystal Terraces consists of three new 5-storey condo buildings with a partial underground parking area located in Qualicum, BC. There will be approximately 30 units per building (90 units total) with one amenity space per building.
This two phase development establishes an engaging and playful exterior design which is at once attractive and memorable making this self-storage facility a recognized destination in the town of Squamish and in the region. The warmth of wood grain combines with the strength and durability and security of tilt panel construction.
Located in the developing Mt. Lehman District, Mt. Lehman Crossing is located on a high visibility commercial property along Hwy #1.
Anchored by major tenants including Shoppers Drug Mart, TD Bank, Scotiabank, Starbucks, and Popeyes Louisiana Kitchen, the first phase of this development is completed. Phase 2 is currently under construction.
This project for Gordon Food Services consisted of an expansion to the existing building as well as a conversion within to provide additional warehouse floor area as well as the addition of a new three-storey office building and 5 elevated parking deck levels.
This project for the Self Storage Depot is a significant regional resource with nearly 500,000 sf in both phases of development. The high density of use resulting from a 5 storeys plus sub-grade utilization deploys an innovative circulation system for the loading areas which are internal along a one way directional route. This internal space is a two storey high utility area allowing for large vehicles and enclosing all of the loading bays internally, protected from the weather and away from the city streetscapes. This also maximizes the on-grade storage unit count to increase the value of the leasable space. Designed with insulated precast panels, curtainwall, brick veneer towers and conventional steel structure. To be constructed via a Construction Management process.
This Self Storage Depot project is a ground breaking development with perhaps the highest density of any new built self-storage project in Canada. Currently planned to be 6 storeys tall in two phases developed vertically, this storage tower concentrates the use on the main level and allows an additional storage capacity below grade. The principal materials are curtainwall, spandrel glass, insulated precast paneling and exposed concrete. Various features on the principal eleva!ons contribute to the ‘cultural’ requirements at the City of North Vancouver. To be delivered via a Construction Management process.