Burnett Street Condo Apartment Building
The Burnett Street Condo project is a 50 unit, five-storey wood frame apartment building on one level of concrete underground parking. The fifth floor rooftop includes an outdoor amenity area.

The Burnett Street Condo project is a 50 unit, five-storey wood frame apartment building on one level of concrete underground parking. The fifth floor rooftop includes an outdoor amenity area.
This project consists of a 24 Unit, four-storey mixed-use commercial/residential building. The main floor will consist of commercial area with residential area on the floors above.
This project consists of a stacked townhouse development as well as single family homes and a potential retail site on a 19.3 acre parcel in Mission, BC.
The Erin Ridge Plaza consists of nine (9) multi-tenant commercial buildings located on a 5.34 acre site in St. Albert, AB.
This Self Storage Depot project is a ground breaking development with perhaps the highest density of any new built self-storage project in Canada. Currently planned to be 6 storeys tall in two phases developed vertically, this storage tower concentrates the use on the main level and allows an additional storage capacity below grade. The principal materials are curtainwall, spandrel glass, insulated precast paneling and exposed concrete. Various features on the principal eleva!ons contribute to the ‘cultural’ requirements at the City of North Vancouver. To be delivered via a Construction Management process.
Crystal Terraces consists of three new 5-storey condo buildings with a partial underground parking area located in Qualicum, BC. There will be approximately 30 units per building (90 units total) with one amenity space per building.
This two phase development establishes an engaging and playful exterior design which is at once attractive and memorable making this self-storage facility a recognized destination in the town of Squamish and in the region. The warmth of wood grain combines with the strength and durability and security of tilt panel construction.
Located in the developing Mt. Lehman District, Mt. Lehman Crossing is located on a high visibility commercial property along Hwy #1.
Anchored by major tenants including Shoppers Drug Mart, TD Bank, Scotiabank, Starbucks, and Popeyes Louisiana Kitchen, the first phase of this development is completed. Phase 2 is currently under construction.
This new retail development consists of seven (7) new, multi-tenant commercial buildings on a 4.66 acre lot.