Located in the Campbell Heights Business Park Phase, the client desired to build a modern facility and the resulting design is minimalist accenting the three primary building materials, concrete, glass and wood. These materials are the focal feature within the exterior facade as well as continued accent within the interior office spaces.
Located on the major arterial Fraser Highway near Aldergrove, the Station Road development project added a two-storey commercial building and car wash to an existing gas station site. Designed to maximize exposure on this high traffic site the resulting building provides a contemporary design to the neighborhood.
Anchored by Shell Canada and Starbucks, this commercial site has a resulting high traffic use.
Located in the developing Mt. Lehman District, Mt. Lehman Crossing is located on a high visibility commercial property along Hwy #1.
Anchored by major tenants including Shoppers Drug Mart, TD Bank, Scotiabank, Starbucks, and Popeyes Louisiana Kitchen, the first phase of this development is completed. Phase 2 is currently under construction.
Completed 2023
16,000 sq.ft.
Tirecraft Tire Shop in Langley
New tire shop and office facility for Tirecraft located in the Gloucester Industrial Park in Langley, BC.
Woody’s RV Vehicle Dealership
We designed this four storey, 65,000 sq.ft. recreation vehicle dealership consisting of a showroom with significant glazing areas opening onto a major collector street in Abbotsford, BC. This project utilizes several key construction technologies including precast and CIP concrete, steel framing as well as mass timber structural elements. The project includes wash bays, multiple service bays, office spaces, and customer amenity areas. It is currently nearing completion and occupancy.
Klondike Cold Storage in Langley
The exterior design was driven from the owner wanting the building to emulate an ice cube and be a reflectance of the operational interior.