Projects

30513 Great Northern Way, Abbotsford, BC

Krahn Group was hired to provide design and engineering services for this three building multi-tenant industrial development located in the Mt. Lehman area. The buildings were constructed using uninsulated concrete tilt-up panels.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed in 2020
58,500 sq.ft. (3 Buildings)
3757 - 190th Street, Surrey, BC

This industrial building is located in the highly desirable Campbell Heights North Business District. It consists of a multi-tenant strata warehouse building with a portion of the building to be occupied by Powerhouse Building Solutions. Features include high glazing, one grade and two dock loading doors.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed 2020
66,250 sq.ft.

Bailey West

Industrial
3635 - 190 Street, Surrey, BC

This project is another addition to the Campbell Heights Industrial area and provides a manufacturing, office, and distribution space for Bailey Metals. The 104,000 sq.ft. concrete tilt-up facility situated on 7 acres comes equipped with custom racking options and a two-level office space. A statement staircase in the lobby and numerous details throughout the building were installed to showcase the clients products.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed 2019
112,500 sq.ft.
1579 Kingsway Avenue, Port Coquitlam, BC

This project consists of 2 identical concrete tilt-up industrial buildings consisting of warehouse and office area.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed 2019
200,000 sq.ft
9349 - 194 Street, Surrey, BC

This project consists of a concrete tilt-up, mixed-use building to have a total gross floor area broken down into 3 sections; 2,000 Sq.ft. storage area, 6,100 Sq.ft. main floor office area and 6,100 Sq.ft. of 2nd storey office area.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed 2019
14,200 sq.ft

Metro Aluminum

Industrial
261108 Wagon Wheel Way, Rocky View County, AB

Krahn Group was hired by Metro Aluminum to design their new facility in Rocky View County, AB. This building consists of 57,000 sq.ft. of warehouse area and 2,000 sq.ft. of office area.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed 2019
60,000 sq.ft.
3495, 3497, 3499 - 63 Avenue, Leduc, AB

Located in Leduc’s aggressively expanding Industrial Area, the Harvest Business Park will prove to become a landmark street of industrial units. Designed with a sleek modern exterior facade, built using tilt-up concrete these facilities will prove to be iconic in the area.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed 2018
140,000 sq.ft. (6 buildings)

Julian Tile

Industrial
10537 - 196 Street NW, Edmonton, AB

Krahn Group was hired to provide full design and consulting services for this new tilt-up warehouse and showroom facility for Julian Tile in Edmonton, AB.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed 2017
35,000 sq.ft.
3855 Mt. Lehman Road, Abbotsford, BC

Krahn Group was hired to provide design and engineering services for this packaging warehouse in the Mt. Lehman area.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed 2017
50,000 sq.ft.
9651 - 51 Avenue NW, Edmonton, AB

Krahn Group was hired to design this new concrete tilt-up warehouse and office building for Tri-Alta Oilfield Industries Ltd.

LPA Inc (now KP Architecture Ltd.)
Industrial
Completed 2016
78,000 sq.ft.