Otter Co-op Retail
This project consists of a 3-storey commercial building which includes a liquor store on the main floor, tasting room and storage area on the 2nd floor and administration office area on the 3rd floor.
This project consists of a 3-storey commercial building which includes a liquor store on the main floor, tasting room and storage area on the 2nd floor and administration office area on the 3rd floor.
Located at Sherwood Drive and Lakeland Drive in Sherwood Park, Aspen Plaza provides 96,000 sq.ft. of commercial space to support the local community. This commercial development comprises of nine buildings on 4.26 acres. Designed to promote pedestrian connectivity and interaction the resulting plaza will promote community gathering while providing retail experiences.
Krahn Group was hired to provide design and engineering services for this concrete tilt-up multi-tenant commercial building located in the Derby Trails Business Park in Langley, BC.
Located on the major arterial Fraser Highway near Aldergrove, the Station Road development project added a two-storey commercial building and car wash to an existing gas station site. Designed to maximize exposure on this high traffic site the resulting building provides a contemporary design to the neighborhood.
Anchored by Shell Canada and Starbucks, this commercial site has a resulting high traffic use.