Author: kpa_admin

Edmonton, AB

This new retail development consists of seven (7) new, multi-tenant commercial buildings on a 4.66 acre lot.

Retail
Completed 2025
55,803 sq.ft.
3810 Sherwood Drive, Sherwood Park, AB

Located at Sherwood Drive and Lakeland Drive in Sherwood Park, Aspen Plaza provides 96,000 sq.ft. of commercial space to support the local community. This commercial development comprises of nine buildings on 4.26 acres. Designed to promote pedestrian connectivity and interaction the resulting plaza will promote community gathering while providing retail experiences.

Retail
Completed 2017
96,000 sq.ft. (9 buildings)
2871 Livingstone Avenue, Abbotsford, BC

Red Valley Enterprises engaged Krahn Group to design and consult on the development of the commercial property located in West Abbotsford. Located in the developing Mt. Lehman District, Mt. Lehman Crossing is located on a high visibility commercial property along Hwy #1.

Anchored by major tenants including Shoppers Drug Mart, TD Bank, Scotiabank, Starbucks, and Popeyes Louisiana Kitchen, the first phase of this development is completed. Phase 2 is currently under construction.

Retail
Phase 1 Completed 2014
Phase 2 Under Construction
27,000 sq.ft. (Phase 1)
16,000 sq.ft. (Phase 2)
Edmonton, AB

This project involves the renovation and addition to an existing building on the Goldbar site. Our team provided the structural, mechanical, electrical, and civil engineering services for this significant renovation project. The project includes the addition of a control room, converting existing offices and support spaces into change rooms, new office spaces, and classroom areas. Additionally, sprinklers will be added to the entire building.

Our mechanical team designed the new HVAC, sprinkler, plumbing systems, service upgrade, and BMS for the building. To ensure the new systems will support the building operations our team conducted a thorough analysis of the existing system for capacity to ensure it’s ability to handle the increased loads. The new mechanical systems are designed to tie into the existing infrastructure including the existing sanitary and storm sewer, HVAC systems, and the addition of new water service to the building. KD Mechanical’s scope also included:

  • A new controls system for the building to connect to the existing site wide controls system.
  • A new HVAC unit to serve the control room which operates 24/7.
  • New water heaters.

KM Civil’s scope included the following:

  • Review of existing utilities alignments onsite and offsite.
  • Review of stormwater Management requirements and overland drainage for the development.
  • Integrate and accommodate new building into the existing infrastructure.
  • Provide new water service connection to the building.
  • Provide design for new raised pararamp into the building.
  • Construction Administration and Field Reviews.
Cold Storage
Completed 2023
- not available -
10119 - 45th Ave NW, Edmonton, AB

This project consists of an approximately 124,465 sq.ft. new addition to the Labatt Brewery facility in Edmonton, AB. The addition includes a new production area, a new RTD area, interior storage and tank rooms, a warehouse area complete with a Logistics office and mezzanine, and an exterior Alcohol Tank Storage building. The project also includes the demolition of the north canopy of the existing Prairie Sales Office, the removal of the existing PH Control Building to be replaced with a new PH Control Building, and the relocation of underground services for the entire site.

Cold Storage
Completed 2022
124,465 sq.ft.

Hallmark Poultry

Cold Storage
1701 Pandora Street, Vancouver, BC

KL Tech and Krahn Engineering were hired by Hallmark Poultry to design their new cold storage facility in Vancouver, BC. The building was constructed out of concrete tilt-up panels with open web steel joist roof and floor systems with concrete suspended slab over underground parking.

Cold Storage
Completed 2007
37,000 sq.ft.
2525 - 188 Street, Surrey, BC

Subzero Cold Logistics is the first integrally insulated tilt-up freezer building in Western Canada. The 42,066 sq.ft. building is an insulated concrete tilt-up freezer storage facility that is designed to maintain temperatures at -25 degree Celsius (-4 degree Fahrenheit) to store frozen foods. The entire warehouse has been equipped with state-of-the-art racking systems to ensure the entire space can be utilized. The building also boasts a wide range of additional structural, thermal, moisture, and maintenance benefits associated with the use of insulated tilt-up construction.

This building won the Tilt-Up Achievement Award in 2019.

Cold Storage
Completed 2019
42,066 sq.ft.
3841 Vanderpol Court, Abbotsford, BC

Krahn Group provided design services for this process grading facility for Golden Valley Foods Ltd. Located in the Mt. Lehman area, this facility contains office, processing and warehouse storage areas.

Cold Storage
Completed 2021
110,000 sq.ft.
5775 - 272 Street, Langley, BC

Klondike Cold Storage engaged the Krahn Group of Companies to provide design services to expand their cold storage operations required to support their processing businesses.

The exterior design was driven from the owner wanting the building to emulate an ice cube and be a reflectance of the operational interior.

Cold Storage
Completed 2019
27,000 sq.ft.
3177 - 188 Street, Surrey, BC

Cloverdale Cold Storage engaged Krahn Group to provide consulting and design
services for several facilities.

Cloverdale Cold Storage III, located at the entry to Campbell Heights Business
Park, is designed to be a gateway building into the business park.

Working with City of Surrey and Cloverdale Cold Storage, the resulting building
is a project that everyone involved in the project is extremely proud of.

Cold Storage
Completed 2015
Building 1 - 86,000 sq.ft.
Building 2 - 135,000 sq.ft.
Building 3 - 425,000 sq.ft.