Burke Place Townhomes
This townhouse development consists of 16, three-storey units located in Coquitlam, BC.
This townhouse development consists of 16, three-storey units located in Coquitlam, BC.
Parksville Industrial is a new multi-tenant industrial/commercial building located in the city of Parksville’s industrial park.
This development offers businesses the opportunity to lease high-quality warehouse space featuring excellent access/egress to Highway 19 and Highway 19A. Features include a new, modern pre-engineered steel industrial warehouse building; 2nd floor mezzanine, providing additional storage or potential office buildout, reserved parking for each unit, clear-span units, grade level loading per unit, 24’ clear height for warehouse and 14’ clear height under mezzanine.
The Kelowna Self Storage project is a mini-storage development with a total of 10 buildings construced in 2 phases. The buildings are single-storey concrete tilt-up buildings.
Krahn Group was hired by Habitat for Humanity to design this 19 unit low-income townhouse development in Mission, BC. These homes are centrally located on 32588 Cedar Valley Connector which is close to three schools and accessible to public transit.
We are very proud to be apart of this important project for the community of Mission.
This four-storey self storage building is a virtual zero lot line development in east Vancouver fronting Clark Drive. It is extremely efficient in space utilization and resolves significant challenges in planning this light industrial use in direct proximity to a residential neighbourhood. It is a very minimalist and modern building design well suited to its urban context. The principal materials are insulated metal panels, conventional steel construction and curtainwall.
This project consists of an approximately 124,465 sq.ft. new addition to the Labatt Brewery facility in Edmonton, AB. The addition includes a new production area, a new RTD area, interior storage and tank rooms, a warehouse area complete with a Logistics office and mezzanine, and an exterior Alcohol Tank Storage building. The project also includes the demolition of the north canopy of the existing Prairie Sales Office, the removal of the existing PH Control Building to be replaced with a new PH Control Building, and the relocation of underground services for the entire site.
The Krahn Group was hired by Clutch Contracting to design this new multi- tenant concrete tilt-up industrial building on the corner of Hume Road and Brown Street in the popular Tilbury Industrial area of Delta, BC. This building features 7 grade loading doors, 24’ clear ceiling height, and LED lighting.
The Krahn Group was hired by Beedie Construction Ltd. to design this concrete tilt-up industrial building in the Gloucester Industrial Park located in Langley, BC. The building also includes a two level office area.
This development consists of five (5) commercial retail buildings.
This five storey urban self-storage facility occupies and very compact land parcel and provides high visibility from a significant retail and industrial neighbourhood. This is an owner built project utilizing conventional steel and precast panel construction Curtainwall is used to allow view into the building as part of the marketing strategy.